Transformer Buyers NC Sell a unit(614) 715-3047
Yard row of pad-mounted transformers of several vintages seen from the gate

No fees, no broker

What We Buy

Surplus, failed and storm-damaged units are bought across North Carolina and collected by our own crew.

What we buy

Ranges we buy on this page

Transformer Buyers NC buys used, surplus, failed and obsolete electrical transformers anywhere in North Carolina. This page covers equipment from 15 kVA distribution units to 100 MVA power transformers, including complete assemblies, stripped tanks and mixed removal lots.

PhasekVAVoltageFluid
1-phase10 - 333 kVAup to 25 kVLiquid or dry
3-phase15 - 20,000 kVA34.5 kVLiquid or dry

Who we buy from

Six kinds of seller

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors
Telehandler holding a grey pad-mounted transformer on yellow lifting straps
A telehandler holding a grey pad-mount on yellow straps.
  • Fast offers

    A written offer the same business day, based on your photographs.

  • Dedicated logistics

    Our own crew, trailer and crane, not a brokered haul.

  • No broker fees

    One buyer from first call to cleared pad, with nothing skimmed.

How it works

Six steps from photograph to payment

  1. 01

    Take pictures

    Photograph the nameplate, the inside of the cabinet and the tank from both ends. Four frames on a phone are enough to price most units.

  2. 02

    Send them to us

    Email or text the photographs with the site address and whether the unit is still energised. We reply the same business day with questions or a number.

  3. 03

    Review the offer

    The offer names the unit, the site, the price and the pickup window. It is written, dated and good for thirty days unless the unit changes hands.

  4. 04

    We schedule freight

    A crew, a trailer and a crane if the pad needs one. You get the date and the arrival window, and the site does not have to close for it.

  5. 05

    Testing on arrival

    Winding resistance, insulation resistance and a turns ratio check, plus oil analysis where the unit is liquid-filled. Results travel with the unit.

  6. 06

    Get paid

    Payment is released against the signed bill of sale and the scale ticket, by check or ACH, with the paperwork copy left on site.

What we handle

The parts sellers dread

  • Rigging

    Crane, skates and a route survey for anything that will not roll onto a trailer.

  • Oil containment

    Pans, absorbent and a spill plan before a drain plug is touched.

  • Bill of sale

    A document that clears a lien, a lease or a bankruptcy file, not a handwritten note.

  • PCB paperwork

    Testing and manifesting for pre-1979 oil, handled before the unit moves.

On the ground

Distribution transformers

Padmounts and pole-mounted transformers are part of the buying scope, including single-phase pole cans and three-phase distribution units. A readable nameplate should show kVA, primary voltage, secondary voltage and serial number.

For a 12.47 kV padmount, include photographs of the elbow compartments, tank seams and bayonet fuse covers.

Failed distribution units can still qualify, but the failure matters. Report a burned bushing, winding fault, leaking gasket or damaged cabinet rather than calling everything scrap.

Units removed from Duke Energy or municipal utility service also need clear ownership documentation; a contractor's possession alone does not establish authority to transfer them.

Local reality

Substation and power transformers

Substation and power transformers require more information than a photograph across the fence. Units up to 100 MVA can be reviewed using nameplate data, drawings and condition records.

Identify primary and secondary voltages, cooling designation, tap changer type, oil volume and whether radiators or bushings have already been removed.

A 115 kV transformer with damaged windings is a different removal job from an intact spare sitting beside its foundation. Tank dimensions, shipping weight, lift points and haul access determine the handling plan.

Note overhead conductors, narrow gates and whether a lowboy can reach the pad without crossing underground duct banks.

Around the site

Dry-types and cast resin

Ventilated dry-type and cast-resin transformers belong in the review, including 480 V building distribution equipment and medium-voltage units. Photograph the nameplate, enclosure and exposed coils where access is authorized.

State whether the winding conductor is copper or aluminum if documented; paint color and enclosure size cannot establish conductor material.

Hospital basement units and plant mezzanine transformers often need a removal plan before acceptance. Door openings, freight elevator limits and floor loading can rule out an otherwise practical lift.

Describe cracked resin, water intrusion, burned insulation or missing enclosure panels, and identify any attached bus duct that remains connected.

Where it sits

Specialty units

Generator step-up transformers, grounding transformers, rectifier transformers and furnace transformers need their actual service identified. A GSU removed from a North Carolina generating site may have unusual bushings, auxiliary wiring or protection connections.

Send the nameplate and connection diagram rather than describing it only as a large three-phase tank.

Special-purpose designs are reviewed individually because duty and construction change the handling requirements. Furnace service can leave severe thermal damage; rectifier service may involve multiple secondary windings.

Include maintenance records, fault history and photographs of separate cooling equipment, conservators and control cabinets so the proposed lot has defined boundaries.

On the ground

Scrap and partial units

Scrap candidates include failed oil-filled transformers, separated core-and-coil assemblies, empty tanks and damaged dry-types. List what remains: copper or aluminum windings, core steel, bushings, radiators and insulating liquid.

A tank described as empty still needs its drain status and residue condition documented before transport or handling is planned.

Fire damage, missing windings and mixed debris can make a partial unit unsuitable for purchase. Photographs should show the tank interior where safely accessible and identify loose components belonging to it.

Oil-soaked soil, concrete and absorbents are not transformer components and cannot be folded into an ordinary equipment lot.

Local reality

Lots and whole rooms

Multiple transformers from a plant closure, utility yard or demolished facility can be reviewed together. Build a unit-by-unit list with serial numbers, kVA or MVA, voltages and approximate weights.

Mark each photograph to match that list, especially when similar padmounts sit in rows or dry-types occupy adjacent electrical rooms.

Whole-room projects need a defined transformer scope, not an assumption that every cabinet will be removed. Identify switchgear, bus duct and cables separately, along with isolation responsibilities and access restrictions.

For a bankruptcy estate, include documentation identifying the owner and the person authorized to approve transfer and site access.

Around the site

What we turn down

Equipment with unresolved PCB liability is not accepted. An old nameplate or a verbal statement that the oil is clean does not settle that question.

Where PCB status is uncertain, provide representative laboratory results, sampling identification and service records linking the result to the specific tank under review.

Asbestos-era units with suspect insulation, barriers or arc-resistant materials may be declined until qualified assessment resolves the hazard. Severely contaminated tanks, unidentified liquid and inaccessible equipment can also be unsuitable.

Small stripped shells with little recoverable material may not justify a dedicated removal, particularly where crane access or containment remains unresolved.

Local reality

The line we do not cross

We buy transformers. We do not sell them, refurbish them for resale, or hold stock for a catalogue. That single fact explains most of what this site does and does not contain: there are no prices, no product pages and no cart.

It also means the offer you get is for the unit as it stands, with the rigging and the paperwork included, rather than a trade-in against something newer.

Get started

Get an offer in minutes

Five fields is all it takes. Photographs help, but a nameplate and a town are enough to start.

No fee, no obligation. We reply the same business day.

Tell us what you have

We reply the same business day.

or call (614) 715-3047

Questions

Straight answers

Equipment types

Can you buy a transformer with failed windings?

Yes, failed windings do not automatically disqualify a transformer. The review needs the nameplate, photographs, failure description and insulating-liquid records where applicable. A winding fault inside an intact tank presents different handling concerns from a ruptured tank with leaked oil or fire debris.

Service area

What information is needed for a mixed transformer lot?

Provide a separate entry for each unit showing serial number, rating, voltage, condition and location within the site. Match photographs to those entries. Include ownership authorization, liquid status and access details, especially when the lot combines pole cans, padmounts and basement dry-types.

Payment

Are older transformers accepted without PCB documentation?

Age alone does not establish PCB status, and unresolved PCB liability prevents acceptance. Depending on the unit and its records, review may require laboratory testing tied to the tank's serial number.

Logistics

Scrap and partial units: what should a seller know?

Scrap candidates include failed oil-filled transformers, separated core-and-coil assemblies, empty tanks and damaged dry-types. List what remains: copper or aluminum windings, core steel, bushings, radiators and insulating liquid.

One buyer, start to finish

Ready to move that transformer?

Call (614) 715-3047 Get an Offer