Demolition

Deadlines drive this one: photographed today, priced tomorrow, collected inside the window you set.

What we buy

Ranges we buy on this page

A building is coming down, and its transformer has to be out before the excavator arrives. This page covers selling a transformer during demolition in North Carolina, with attention to the permit date, crane access and the pad's location.

PhasekVAVoltageFluid
1-phase10 - 333 kVAup to 25 kVLiquid or dry
3-phase50 - 20,000 kVA115 kVLiquid or dry

Who we buy from

Six kinds of seller

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors
Single pad-mounted transformer cabinet on a concrete pad with a forklift behind
A single pad-mounted cabinet on a concrete pad beside a forklift.
  • Fast offers

    A written offer the same business day, based on your photographs.

  • Dedicated logistics

    Our own crew, trailer and crane, not a brokered haul.

  • No broker fees

    One buyer from first call to cleared pad, with nothing skimmed.

How it works

Six steps from photograph to payment

  1. 01

    Take pictures

    Photograph the nameplate, the inside of the cabinet and the tank from both ends. Four frames on a phone are enough to price most units.

  2. 02

    Send them to us

    Email or text the photographs with the site address and whether the unit is still energised. We reply the same business day with questions or a number.

  3. 03

    Review the offer

    The offer names the unit, the site, the price and the pickup window. It is written, dated and good for thirty days unless the unit changes hands.

  4. 04

    We schedule freight

    A crew, a trailer and a crane if the pad needs one. You get the date and the arrival window, and the site does not have to close for it.

  5. 05

    Testing on arrival

    Winding resistance, insulation resistance and a turns ratio check, plus oil analysis where the unit is liquid-filled. Results travel with the unit.

  6. 06

    Get paid

    Payment is released against the signed bill of sale and the scale ticket, by check or ACH, with the paperwork copy left on site.

What we handle

The parts sellers dread

  • Rigging

    Crane, skates and a route survey for anything that will not roll onto a trailer.

  • Oil containment

    Pans, absorbent and a spill plan before a drain plug is touched.

  • Bill of sale

    A document that clears a lien, a lease or a bankruptcy file, not a handwritten note.

  • PCB paperwork

    Testing and manifesting for pre-1979 oil, handled before the unit moves.

On the ground

The situation

A transformer beside a building scheduled for demolition is not just another item on the salvage list. Its tank may sit beneath an overhang, behind a fence or beside the excavator's approach. Those details determine whether removal must precede other site clearing.

Ownership needs to be settled before the crew touches the enclosure. A pad-mounted transformer serving a vacant building may still belong to the utility.

Check asset records and the service agreement rather than assuming that equipment inside the demolition fence belongs to the property owner.

Local reality

What Demolition changes about the sale

The demolition date is fixed, and transformer removal has to fit inside that deadline. A later lift can become impossible once walls, staging piles or temporary barriers block the crane. The removal plan must account for site changes between inspection and pickup.

A transformer pad inside the fall zone requires particular attention. Falling masonry can crush bushings, tear radiators or damage the tank before lifting begins. Identify the demolition sequence and keep the equipment outside active demolition work until electrical isolation and removal are complete.

Around the site

Documentation that matters

The demolition permit date is the first scheduling document to provide, along with the actual planned demolition start. Include any conditions affecting utility disconnection or site access. A permit date alone does not establish that the transformer is isolated or ready to lift.

Photographs of the nameplate, asset tag and tank help establish identity and condition before demolition obscures them. Send ownership records, available oil test reports and any PCB documentation. An old inspection label is useful background, but it does not replace current electrical isolation records.

Where it sits

Risk and liability

An empty building can still have energized primary cables at the transformer. Utility coordination and qualified electrical personnel are required to establish isolation, verify absence of voltage and address grounding.

A demolition contractor's disconnected interior panel is not proof that primary conductors are safe.

Oil leakage changes the removal plan, especially where cracked concrete drains toward a storm inlet. Record wet gasket seams, damaged radiator fins and stained soil before demolition disturbs the area. Suspected PCB contamination requires appropriate evaluation and handling; appearance alone cannot establish oil classification.

On the ground

Timing

Work backward from the excavator's arrival, not from the day someone notices the transformer on the pad. Allow time for ownership confirmation, utility disconnection, document review and lift planning. A blocked driveway or delayed cable separation can prevent removal on the intended day.

Crane access can disappear as demolition preparations advance. Scaffolding, dumpsters and rubble piles may occupy the only suitable setup area. Confirm the access route and lifting area before scheduling, then check them again if fencing moves or the demolition crew changes its staging layout.

Local reality

How we handle demolition

Transformer Buyers NC buys used, surplus, failed and obsolete transformers across North Carolina, including equipment removed for demolition. Review starts with the transformer details and site constraints. The permit date, fall zone and crane approach help determine whether a removal plan is workable.

Removal planning addresses the actual tank, lifting points and haul route rather than a generic building-clearing sequence. The equipment's weight, condition and location inform rigging and transport requirements.

Pickup coordination must follow confirmed electrical isolation and an agreed site sequence that keeps demolition operations separate.

Around the site

What to send first

Start with the site address, demolition permit date and scheduled excavator arrival. State whether the transformer pad is inside the fall zone. Include a nameplate photograph and wide views showing the building, transformer, overhead obstructions and the route from the pad to the street.

Describe crane access with measurements where possible: gate width, overhead clearance and distance from the setup area to the tank. Identify who owns the transformer and who controls utility disconnection. Note leaking oil, damaged bushings or debris already leaning against the enclosure.

Get started

Get an offer in minutes

Five fields is all it takes. Photographs help, but a nameplate and a town are enough to start.

No fee, no obligation. We reply the same business day.

Tell us what you have

We reply the same business day.

or call (614) 715-3047

Questions

Straight answers

Equipment types

Can demolition start before the transformer is removed?

That depends on the demolition sequence and separation from the equipment. A transformer inside the fall zone or beside the excavator's working area needs removal addressed first. Electrical isolation, crane access and exclusion areas must be resolved before nearby demolition proceeds.

Service area

What if the transformer belongs to the utility?

The property owner cannot authorize its sale without ownership authority. Confirm the asset tag and service records with the utility. Coordinate utility-owned equipment removal through that utility, and incorporate its disconnection and removal schedule into the building's demolition sequence.

Payment

Which photos help plan a demolition pickup?

Send the nameplate, all sides of the tank, lifting points and visible damage. Wider photographs should show the pad relative to the building's fall zone, crane setup area, gate and haul route. Include overhead wires and any rubble or fencing restricting access.

Logistics

Timing: what should a seller know?

Work backward from the excavator's arrival, not from the day someone notices the transformer on the pad. Allow time for ownership confirmation, utility disconnection, document review and lift planning. A blocked driveway or delayed cable separation can prevent removal on the intended day.