What we buy
Ranges we buy on this page
Transformer Buyers NC buys used, surplus, failed and obsolete transformers in Roxboro and across Person County. This page covers equipment identification, ownership records and removal planning for plant engineers, hospital facilities directors, utility asset managers, contractors and trustees.
Roxboro work can involve a campus pad-mounted unit or transmission-scale equipment associated with power generation. The tank, fluid records, lifting arrangement and route to US-501 all matter before a truck arrives.
| Phase | kVA | Voltage | Fluid |
|---|---|---|---|
| 1-phase | 10 - 333 kVA | up to 25 kV | Liquid or dry |
| 3-phase | 50 - 20,000 kVA | 115 kV | Liquid or dry |
Who we buy from
Six kinds of seller
- Recyclers
- Electrical contractors
- Equipment dealers
- End users
- Demo contractors
- Distributors

Fast offers
A written offer the same business day, based on your photographs.
Dedicated logistics
Our own crew, trailer and crane, not a brokered haul.
No broker fees
One buyer from first call to cleared pad, with nothing skimmed.
How it works
Six steps from photograph to payment
- 01
Take pictures
Photograph the nameplate, the inside of the cabinet and the tank from both ends. Four frames on a phone are enough to price most units.
- 02
Send them to us
Email or text the photographs with the site address and whether the unit is still energised. We reply the same business day with questions or a number.
- 03
Review the offer
The offer names the unit, the site, the price and the pickup window. It is written, dated and good for thirty days unless the unit changes hands.
- 04
We schedule freight
A crew, a trailer and a crane if the pad needs one. You get the date and the arrival window, and the site does not have to close for it.
- 05
Testing on arrival
Winding resistance, insulation resistance and a turns ratio check, plus oil analysis where the unit is liquid-filled. Results travel with the unit.
- 06
Get paid
Payment is released against the signed bill of sale and the scale ticket, by check or ACH, with the paperwork copy left on site.
What we handle
The parts sellers dread
Rigging
Crane, skates and a route survey for anything that will not roll onto a trailer.
Oil containment
Pans, absorbent and a spill plan before a drain plug is touched.
Bill of sale
A document that clears a lien, a lease or a bankruptcy file, not a handwritten note.
PCB paperwork
Testing and manifesting for pre-1979 oil, handled before the unit moves.
On the ground
Roxboro, briefly
Roxboro is the county seat of Person County, in North Carolina’s Triangle region. The county has about 39,000 residents, but population alone does not explain its transformer mix. Power generation brings equipment substantially larger than the units serving ordinary commercial buildings.
For a Roxboro property transfer or plant closure, distinguish the transformer from the land and surrounding switchgear. A deed, asset schedule or utility service agreement helps establish ownership. Equipment behind a facility fence is not necessarily equipment that the facility can authorize for removal.
Local reality
Power supply
Duke Energy Progress is the utility named in Roxboro’s power supply context. Before discussing removal, confirm whether a transformer belongs to the utility or the customer. Service drawings and account records can help identify that boundary, especially where a campus has multiple feeds.
At a Person County power plant support site, the nameplate should establish the actual voltage ratio, cooling designation and impedance. Do not infer voltage from tank size. Photographs of bushings, radiators and control cabinets help separate the transformer from adjacent breakers and auxiliary equipment.
Around the site
The industrial base
Roxboro’s industrial base includes power plant support, a textiles legacy, hospital campuses and tobacco operations. Those settings create different removal constraints: an idle textile building may have uncertain records, while a hospital transformer can remain tied to occupied buildings and essential electrical loads.
A former tobacco facility in Person County may have equipment separated from its original maintenance files. Start with the serial number, nameplate and last known operating condition.
For hospital campuses, include the approved outage scope and any temporary power arrangements before defining the removal boundary.
Where it sits
Transport
US-501 and NC-57 are the principal named road corridors for this Roxboro review. Neither road designation confirms that a loaded trailer can reach a particular pad.
The route survey must cover driveway width, bridge restrictions, overhead clearance and the final turn into the property.
The Norfolk Southern line and the Port of Wilmington, roughly 170 miles southeast, provide regional transport context. Their presence does not establish a usable rail siding or a port movement for any transformer.
Confirm loading access and the actual receiving destination before choosing a mode.
On the ground
Heavy haul in Roxboro
The power plant is why Person County has transmission-scale iron at all. For those units, obtain documented transport weight and dimensions rather than estimating from photographs.
Radiators, conservators and bushings may change the shipping envelope, but any removal requires an equipment-specific handling plan.
A lowboy approaching a Roxboro plant needs more than a clear gate. Check axle loading, crane setup ground, underground utilities and room for trailer alignment.
The lift plan should identify rated lifting points, spreader bar requirements and whether detached components travel with the main tank.
Local reality
What turns up
We evaluate used, surplus, failed and obsolete transformers from Roxboro facilities, including pad-mounted, dry-type and larger liquid-filled equipment. Record the failure mode precisely: a leaking radiator gasket, damaged bushing or winding fault presents different handling concerns.
A failed unit still needs identification and ownership documentation.
For a Person County pad-mounted transformer, photograph the bayonet fuse compartment and elbow connections only when authorized personnel can access them safely. Include fluid test reports and PCB documentation where applicable.
Missing records should be identified as missing, not replaced with assumptions about age or condition.
Around the site
How to start
Begin a Roxboro assessment with readable nameplate photographs, overall views, the site address and an ownership contact. State whether the unit is energized, disconnected or already staged. Include serial numbers in the asset list so equipment in separate buildings does not get confused.
Before pickup in Person County, align the release paperwork with the physical work: authorized disconnection, fluid handling, lifting and transport. Identify who signs the asset release and who controls site access. Transformer Buyers NC reviews that information to assess purchase and removal requirements.
Get started
Get an offer in minutes
Five fields is all it takes. Photographs help, but a nameplate and a town are enough to start.
No fee, no obligation. We reply the same business day.
Tell us what you have
We reply the same business day.
Questions
Straight answers
Equipment types
Can you buy failed transformers in Roxboro?
Yes. We evaluate failed Roxboro transformers as well as used, surplus and obsolete units. Provide the nameplate, ownership records and failure description. Note leaking fluid, damaged bushings or evidence of overheating so the assessment accounts for safe handling and removal.
Service area
Who authorizes removal of a utility transformer?
For equipment connected to Duke Energy Progress service in Roxboro, first verify ownership through the service agreement or utility records. The owner must authorize transfer, and authorized electrical personnel must establish the disconnection boundary before lifting or loading begins.
Payment
What records help plan a Person County haul?
Provide documented transport weight, shipping dimensions, lifting drawings and photographs of the access route. For transmission-scale equipment associated with Person County power generation, include component removal instructions if available. The carrier still needs to verify the route and applicable permits.
Logistics
Heavy haul in Roxboro: what should a seller know?
The power plant is why Person County has transmission-scale iron at all. For those units, obtain documented transport weight and dimensions rather than estimating from photographs.
