Transformer Buyers NC Sell a unit(614) 715-3047
Three grey pad-mounted transformers with switchgear cabinets on a concrete pad

No fees, no broker

Westinghouse Transformer Buyers

Nameplate, serial and tank style settle the vintage; the offer and the pickup follow within days.

What we buy

Ranges we buy on this page

Transformer Buyers NC buys used, surplus, failed, and obsolete Westinghouse transformers throughout North Carolina. This page covers older tanks, nameplate identification, PCB documentation, and removal planning for plant engineers, utility asset managers, facility directors, contractors, demolition crews, and trustees.

Westinghouse's transformer business was sold and rebranded, leaving a large installed base. A familiar badge needs to be checked against the build date, maintenance records, and any later replacement plate.

PhasekVAVoltageFluid
1-phase10 - 333 kVA600 V - 25 kVLiquid or dry
3-phase15 kVA - 20 MVAup to 230 kVLiquid or dry

Who we buy from

Six kinds of seller

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors
Yard row of pad-mounted transformers against a chain-link fence with overhead wires
The yard row against the fence, wires overhead.
  • Fast offers

    A written offer the same business day, based on your photographs.

  • Dedicated logistics

    Our own crew, trailer and crane, not a brokered haul.

  • No broker fees

    One buyer from first call to cleared pad, with nothing skimmed.

How it works

Six steps from photograph to payment

  1. 01

    Take pictures

    Photograph the nameplate, the inside of the cabinet and the tank from both ends. Four frames on a phone are enough to price most units.

  2. 02

    Send them to us

    Email or text the photographs with the site address and whether the unit is still energised. We reply the same business day with questions or a number.

  3. 03

    Review the offer

    The offer names the unit, the site, the price and the pickup window. It is written, dated and good for thirty days unless the unit changes hands.

  4. 04

    We schedule freight

    A crew, a trailer and a crane if the pad needs one. You get the date and the arrival window, and the site does not have to close for it.

  5. 05

    Testing on arrival

    Winding resistance, insulation resistance and a turns ratio check, plus oil analysis where the unit is liquid-filled. Results travel with the unit.

  6. 06

    Get paid

    Payment is released against the signed bill of sale and the scale ticket, by check or ACH, with the paperwork copy left on site.

What we handle

The parts sellers dread

  • Rigging

    Crane, skates and a route survey for anything that will not roll onto a trailer.

  • Oil containment

    Pans, absorbent and a spill plan before a drain plug is touched.

  • Bill of sale

    A document that clears a lien, a lease or a bankruptcy file, not a handwritten note.

  • PCB paperwork

    Testing and manifesting for pre-1979 oil, handled before the unit moves.

On the ground

Westinghouse's design signature

Westinghouse transformers built from the 1950s through the 1980s are associated with conservative winding designs and heavy tanks. Those features matter during removal: the tank, core, and winding assembly can impose substantial loads even after insulating oil has been drained under an approved procedure.

A heavy Westinghouse tank is not proof of sound insulation. Decades of loading, moisture entry, and gasket deterioration can leave a substantial-looking unit with compromised windings.

Maintenance records and electrical test reports tell more about its condition than the thickness of the steel shell.

Local reality

The Westinghouse units we see in North Carolina

A Westinghouse unit at a North Carolina industrial property may remain connected to plant distribution, sit disconnected beside a substation, or be enclosed in an obsolete electrical room. Each location changes the inspection plan, especially where fences, overhead conductors, or narrow doors restrict access.

For a hospital facilities director or bankruptcy trustee, Westinghouse identification often starts with incomplete paperwork rather than operating history. A nameplate photograph, equipment schedule, and last maintenance report help separate the actual transformer from adjacent switches, protective equipment, and records belonging to another unit.

Around the site

Known failure modes

Oil leaks deserve a close look on older Westinghouse tanks. Wet seams, stained radiator connections, and oil beneath a gasket can identify the source, but staining alone does not establish an active leak. Record the location and check whether the oil level has changed.

Bushing seal failure can leave oil around a porcelain base or tank penetration. On pre-1979 Westinghouse units, PCB content is a separate concern that must be resolved through appropriate records and testing.

Age flags the question; it does not establish the oil's PCB concentration.

Where it sits

Reading a Westinghouse nameplate

Start with a readable Westinghouse nameplate photograph showing the serial number, build date, kVA rating, primary and secondary voltages, and connection information. Include cooling designation and impedance where legible.

Photograph the full plate before taking close-ups so each detail remains tied to the same transformer.

Because Westinghouse's transformer business was sold and rebranded, a later badge can complicate identification. Compare replacement plates with the original serial number and drawings.

Do not assume a newer company name means a newer core, winding assembly, tank, or insulating fluid charge inside it.

On the ground

What we check on site

For a Westinghouse inspection, we check the build date, PCB test documentation, and evidence that the unit was rebranded after the sale. A useful laboratory report identifies the sampled equipment and sample date. A loose report without matching identification leaves the oil history unresolved.

The physical inspection covers Westinghouse tank leaks, bushing seals, radiator damage, lifting points, and visible alterations. Site personnel must establish isolation and safe access before close inspection. An energized unit is not opened merely to obtain a better photograph or confirm an uncertain connection.

Local reality

Transport and rigging notes

Older Westinghouse tanks require confirmed weights rather than estimates based on appearance. Record the nameplate weight when provided and distinguish total weight from oil or untanking weights. The rigging plan must account for attached radiators, bushings, and any components removed before the lift begins.

At a North Carolina site, a lowboy approach may be blocked by a tight gate, weak pavement, or an overhead line. Check the Westinghouse unit's lifting lugs and transport dimensions before selecting equipment.

A spreader bar may be needed to maintain the planned sling geometry.

Around the site

What the badge does to value

The Westinghouse badge provides manufacturing context, not a verdict on the equipment. Conservative windings and heavy tanks explain part of the design history.

Build date, test results, leakage, and identification determine whether that particular unit can be evaluated as serviceable equipment or requires another disposition.

A rebranded Westinghouse unit needs the same scrutiny as one carrying its original plate. Traceable PCB results and a consistent serial-number record support a clearer assessment.

Missing documents, damaged bushings, or inaccessible lifting points remain practical obstacles regardless of the name stamped on the tank.

Get started

Get an offer in minutes

Five fields is all it takes. Photographs help, but a nameplate and a town are enough to start.

No fee, no obligation. We reply the same business day.

Tell us what you have

We reply the same business day.

or call (614) 715-3047

Questions

Straight answers

Equipment types

Do you buy failed Westinghouse transformers in North Carolina?

Yes. Transformer Buyers NC buys failed Westinghouse transformers as well as used, surplus, and obsolete units. Evaluation includes the nameplate, failure description, oil condition, PCB documentation, and removal access. A winding failure and a leaking bushing require different inspection details.

Service area

Does a pre-1979 Westinghouse transformer always contain PCBs?

No. A pre-1979 build date raises a PCB concern but does not prove PCB content. Review a laboratory report tied to that Westinghouse unit and its fluid history. Documented fluid replacement also matters, but it does not substitute for an appropriate PCB determination.

Payment

What if the Westinghouse badge has been replaced?

Photograph the replacement badge, any original plate, and the serial number. Westinghouse's transformer business was sold and rebranded, so identification may require drawings or maintenance records. A replacement badge alone does not establish the age of the tank, windings, or oil.

Logistics

The Westinghouse units we see in North Carolina: what should a seller know?

A Westinghouse unit at a North Carolina industrial property may remain connected to plant distribution, sit disconnected beside a substation, or be enclosed in an obsolete electrical room. Each location changes the inspection plan, especially where fences, overhead conductors, or narrow doors restrict access.

One buyer, start to finish

Ready to move that transformer?

Call (614) 715-3047 Get an Offer